More than you planned?

You don't have to build it all at once

Seeing the full price of your dream backyard can be a shock. It's one of the most common moments in this whole process. Lots of homeowners start with a $100,000 wish list and a $50,000 budget. The answer usually isn't giving up the project. It's deciding what comes first.

Talk to us about a phased plan

Wide turf lawn beside a gray stone pool patio in Goodyear

Where to start

What matters most to you right now?

Pool with two stainless steel arc fountains spilling into the water over a blue tile wall in Verrado (Buckeye)
01

Summers in the pool

If your family's summers revolve around the water, start with the pool. A remodel or new pool goes in first, and the outdoor kitchen, shade and extras come in phase 2. You get the part you'll use most from May to October right away.

Covered outdoor kitchen with a grill, TV and fire dining table at sunset in Peoria
02

Gatherings and family time

If your backyard is where you host barbecues, birthdays and game nights, start there. Build the patio, outdoor kitchen, turf or sports area first, and plan the pool as phase 2. We design the whole yard up front so the pool has its spot waiting.

Step by step

How a phased plan works

  1. 01Design the whole yard onceAt your free consultation and 3D design, we plan everything on your wish list, not just phase 1, so every phase fits together.
  2. 02Pick your phase 1We split the design into phases that each make sense on their own, based on your budget and what matters most.
  3. 03Plan ahead for phase 2We recommend running the electrical and plumbing for the whole project in phase 1, and we plan the phases so later work doesn't tear up earlier work. For example, rock can serve as a temporary ground cover where the next phase goes, and the future pool is placed so finished areas aren't disturbed. Your 3D design shows every phase.
  4. 04Build phase 2 when you're readyNext season, next year, or whenever the timing works. Your design is already done.

Financing is available through Lyon Financial, subject to credit approval, and can help with any phase.

Examples

What a phased plan can look like

These are example plans to show how phasing works, not specific past projects. Your plan will be built around your yard and your budget.

Example 1

The pool comes first

Wish list: Pool remodel with new tile and coping, a spa, an outdoor kitchen and a pergola.

Phase 1

  • Pool resurfacing + upgrades (tile, coping, Baja step, equipment)$25K–$50K

Phase 2

  • Spa+$15K–$30K
  • Outdoor kitchen$15K–$40K
  • Pergola$15K–$35K

Why: They wanted the pool ready for summer; phase 2 adds the hangout space around it.

Example 2

The backyard comes first

Wish list: A full backyard for hosting, and a new pool.

Phase 1

  • Backyard with pavers, turf, plants and irrigation$35K–$70K

Phase 2

  • Compact pool$50K–$70K
  • or a standard family pool$65K–$100K

Why: They host family most weekends; the 3D design saved the pool's spot from day one.

Example 3

Fix the pool now, add the extras later

Wish list: Worn pool, new deck, waterfall, fire features.

Phase 1

  • Resurfacing$10K–$20K
  • New pool deck+$10K–$30K

Phase 2

  • Water features+$5K–$15K
  • Fire features+$5K–$15K

Why: The pool and deck needed work now; the features are next year's upgrade.

Example 4

Back yard now, front yard next

Wish list: New landscaping front and back.

Phase 1

  • Backyard$35K–$70K

Phase 2

  • Front yard$25K–$45K

Why: The backyard is where they live; the front yard can wait a year.

Planning ranges, not quotes. Exact prices after the free consultation and 3D design.

From a homeowner

A phased project, on schedule

Want help planning it in phases?

Tell us what's on your wish list and what you'd like to spend to start. We'll reach out to talk through a phased plan. No pressure.

What's on your full wish list?

What matters most to start with?

About how much would you like to spend on phase 1?

When would you like to start phase 1?

FAQ

Phased plan questions

What goes in phase 1?

Usually the part you will use most, like the pool or the patio and outdoor kitchen, plus the electrical and plumbing for the whole project. We decide it together on a quick phone call, based on your budget and what matters most to you.

Why run the electrical and plumbing in phase 1?

Running the electrical and plumbing for every phase at the start means we do not have to dig up finished areas later. It is one of the main ways a phased plan saves money and mess.

Will phase 2 tear up phase 1?

Not when it is planned right. We plan the phases so later work does not disturb earlier work. For example, rock can serve as a temporary ground cover where the next phase goes, and the future pool is placed so finished areas are not disturbed.

Can I see the whole plan in 3D?

Yes. Your 3D design shows the whole yard and every phase, so you can see how phase 1 fits the finished project.

Can I finance a phase?

Yes. Financing is available through Lyon Financial, subject to credit approval, and can help with any phase. See example payments.

How long can I wait between phases?

That is up to you: next season, next year, or whenever the timing works. Your design is already done when you are ready for the next phase.

Not ready yet? That's fine. Look around our projects for ideas →